The project consisted of the complete renovation and expansion of the existing Emergency Department. The engineering design and resulting construction was required to be phased to allow the department to remain in operation during the construction period.
The department was expanded into the existing ambulance entrance, with a new ambulance canopy established to the south. All existing treatment, trauma, procedure and triage rooms were renovated, and six new treatment rooms were provided. The existing nurses station was repositioned and reconfigured to provide improved visibility and control. Expanded waiting and family consoling offices were also provided. The mechanical and electrical infrastructure was reviewed and modified to accommodate the expansion. The medical gas system was expanded and modified to accommodate the additional treatment rooms.